Project Details

With an accelerated schedule, the primary focus of this project was the reconstruction of the outbound  lane and stabilization of the hillside.  A Rockfall Retaining System was placed along the Parkway West below the Boulevard of the Allies along with additional slope protection netting.

  • Renovation
  • Reconstruction of right lane and four structures
  • 1.669 miles
  • 12 months of construction
  • General contractor

Location: Pittsburgh, Pennsylvania

Owner: Pennsylvania Department of Transportation