Project Details

The improvements were needed to increase the vertical clearance inside the 1,600 linear-foot-long stretch of the tracks.  Work included utility relocations, drainage improvements, and removal of overhead structures near both tunnel portals.

  • Renovation
  • 15 months of construction
  • Design-build

Location: Pittsburgh, Pennsylvania

Owner: CSX Transportation