Project Details

The work consisted of removal of a 150-foot high and 600-foot long hillside, excavation, roadway widening, and replacement. It also included structure replacements and utility installation. 

  • Renovation
  • 100,000 cubic yards of earth removal
  • 27 months of construction
  • General contractor

Location: Pittsburgh, Pennsylvania

Owner: Pennsylvania Department of Transportation