Project Details
The work consisted of removal of a 150-foot high and 600-foot long hillside, excavation, roadway widening, and replacement. It also included structure replacements and utility installation.
- Renovation
- 100,000 cubic yards of earth removal
- 27 months of construction
- General contractor
Location: Pittsburgh, Pennsylvania
Owner: Pennsylvania Department of Transportation