Project Details

The end zone addition provided approximately 2,700 new seats featuring five private suites, additional club seating with access to a themed club area, and general admission seating.  Work included demolition, relocation, and installation of new utilities; a new mezzanine level; additional concession and bathroom facilities; removing and replacing the warning track and trench around the field; new HVAC piping run through the FedEx Great Hall to tie-in the addition; and modifications to existing stadium entrances and exits.

  • Addition
  • 60,000 square feet
  • 6 months of construction
  • Construction manager at risk

Location: Pittsburgh, Pennsylvania

Owner: PSSI Stadium Corp.

Mascaro Advantage

A quality control plan was specifically tailored for the project that incorporated the principles of ISO 9000, ISO 9001, ISO 9004, and the stringent requirements of the U.S. Army Corps of Engineers.  Our project team knew who was responsible for adhering to the quality requirements, but more importantly, provided the necessary supervision and documentation to meet or exceed these requirements.  The project was completed on time, under budget, with high quality craftsmanship, no lost time or recordable incidents, and a total team dedication that would make any Pittsburgh Steeler fan proud.