Project Details
With an accelerated schedule, the primary focus of this project was the reconstruction of the outbound lane and stabilization of the hillside. A Rockfall Retaining System was placed along the Parkway West below the Boulevard of the Allies along with additional slope protection netting.
- Renovation
- Reconstruction of right lane and four structures
- 1.669 miles
- 12 months of construction
- General contractor
Location: Pittsburgh, Pennsylvania
Owner: Pennsylvania Department of Transportation