Project Details

Mascaro was a subcontractor to the company that was responsible for the stair tower and steel erection. The steel stair tower consists of five levels. The process tower erection covered five levels, which required 55 tons of galvanized steel. Mascaro welded the seams for the checkered plate floor on levels 2, 3, 4 and 5; and constructed a partition wall with metal sheets and insulation in an existing building.

  • Structural steel erector
  • 55 tons of structural steel
  • 58-foot high process tower
  • 64-foot high stair tower

Location: West Elizabeth, Pennsylvania

Owner: Eastman Chemical Resins, Inc.