Project Details

Mascaro installed new continuous pipe mill equipment into the existing 60-inch wide, cold formed, fusion welded line at the Dura-Bond Plant to replace the looper entry end pinch roller, coil straightener, and mill entry table. A new scrap chopper and a new edge trimming machine were also installed.

  • 80 tons of equipment replaced
  • Placement of 11-inch concrete equipment pad
  • 10-day outage

Location: McKeesport, Pennsylvania

Owner: Dura-Bond Industries