Project Details

Construction of a new roasting and ferroalloy production facility on a greenfield site. Mascaro’s first contract was for the early site development work. Additional contracts included foundation and construction of a pre-engineered metal building for raw material storage; concrete foundations for the melt shop, melt shop feed, roaster building, baghouses, conveyors, and rail unloading; and site finalization including road paving.

  • 154-acre site development
  • 650,000 cubic yards of excavation
  • 18,600 cubic yards of foundation concrete
  • 32,286-square-foot pre-engineered metal building
  • 81,000 square yards of road paving
  • 3,500 tons of structural steel

Location: Central Ohio

Owner: Confidential Client