Project Details
Construction of a new roasting and ferroalloy production facility on a greenfield site. Mascaro’s first contract was for the early site development work. Additional contracts included foundation and construction of a pre-engineered metal building for raw material storage; concrete foundations for the melt shop, melt shop feed, roaster building, baghouses, conveyors, and rail unloading; and site finalization including road paving.
- 154-acre site development
- 650,000 cubic yards of excavation
- 18,600 cubic yards of foundation concrete
- 32,286-square-foot pre-engineered metal building
- 81,000 square yards of road paving
- 3,500 tons of structural steel
Location: Central Ohio
Owner: Confidential Client