Project Details

Mascaro installed the upper reservoir emergency shutoff gate for this operating power generating station. 

  • General contractor
  • Renovation of 107 feet high dam intake structure
  • Erect two temporary steel cofferdams 23 feet wide and 30 feet tall with bypass piping
  • 2,530 cubic yards of mass concrete
  • Install two 12 feet by 30 feet wheel gates with lift assemblies

Location: New Jersey

Owner: First Energy Corp.