Project Details
A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (FGD) process. This facility also discharges the treated waste water over 15 miles to the river.
- New construction
- 2,350 cubic yards of concrete
- 12 months of construction
- Design-build
Location: Shelocta, Pennsylvania
Owner: NRG Energy, Inc.