Project Details
The scope of the project involved design and installation of a 20-inch gas line service. The existing line remained operational during construction and was capped after project commissioning.
- Replacement of existing line with a 20-inch high pressure gas line
- 25 service taps
- 3,200 lineal foot of directional drilling under river bed
- EPC contractor
- Six miles of access roads/erosion and sedimentation control and ROW clearing
Location: Johnstown, Pennsylvania
Owner: EQT Corporation