TP-1160 Pipeline Replacement

TP-1160 Pipeline Replacement
Client

EQT Corporation

Location Pin

Johnstown, Pennsylvania

  • 25 service taps
  • 3,200 lineal foot of directional drilling under river bed
  • Six miles of access roads/erosion and sedimentation control and ROW clearing
  • EPC contractor

Project Details

The scope of the project involved design and replacement of an existing line with a 20-inch high-pressure gas line service.  The existing line remained operational during construction and was capped after project commissioning.