TP-1160 Pipeline Replacement
![TP-1160 Pipeline Replacement](https://www.mascaroconstruction.com/uploads/Projects/A-E/EQT_TP-1160Pipeline_810wX440h.jpg)
Client
EQT Corporation
Johnstown, Pennsylvania
- 25 service taps
- 3,200 lineal foot of directional drilling under river bed
- Six miles of access roads/erosion and sedimentation control and ROW clearing
- EPC contractor
Project Details
The scope of the project involved design and replacement of an existing line with a 20-inch high-pressure gas line service. The existing line remained operational during construction and was capped after project commissioning.