The scope includes the installation of three 4160V 2.5Mw diesel generators supplying emergency power, three 2,750 ton chillers supplying chilled water, three 50,000 lb/hr steam boiler systems supplying heating, a three-cell cooling tower, two 7.5 MVA transformers, insulated metal panels, masonry exterior, and drilled caisson foundations.
- New construction
- 35,000 linear feet of underground piping
- 11 months of construction
- Design-build
Location: Pittsburgh, Pennsylvania
Owner: Clearway Energy Inc.