S.R. 22 - Section B01

Client
Pennsylvania Department of Transportation
Murrysville, Pennsylvania
- Two bridges
- Two box culverts
- One soldier pile wall
- 200,000 cubic yards of excavation
- 185 driveways
- General contractor
Project Details
This project involved the replacement of 3.1 miles of existing three-lane highway with five lanes. Work included upgrade and replacement of the storm water system and upgrades to nine signalized intersections. Recipient of the ABCD Outstanding New Multi-Span Bridge Award.