Y Loop and K Loop
![Y Loop and K Loop](https://www.mascaroconstruction.com/uploads/Projects/A-E/CurtissWright_K-L-Loop_810wX440h.jpg)
Client
Confidential Client
Pennsylvania
- New construction
- 1,200 cubic yards of concrete
- 180 tons of structural steel
- 9 months of construction
- General trades contractor
Project Details
Mascaro was contracted by a confidential client to build a test stand for the water cooling pumps of Westinghouse’s AP1000 Nuclear Reactor. The AP1000 is a generation III+ nuclear power plant designed by Westinghouse. The test unit simulates actual operating conditions for the 250 ton electro-hydraulic pumps.